Tianjin-Made High-Quality ERW Steel Pipe for Various Industrial Applications

Customization: Available
After-sales Service: Quality Problem Can Send Free New
Warranty: 20years

Product Description

Basic Information
Model NO.
Q195, Q235, Q345, SPCC, DX51D, DX52D, DC01, DC02, SGHC, SGC
Type
Welded
Technique
ERW
Material
Carbon Steel
Usage
Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Construction & Decoration
Section Shape
Round
Standard
GB
Thickness
3-80mm
Production Capacity
15000 Tons Per Month
HS Code
7306301100
Product Description
ERW Steel Pipe
ℹ️
High-Quality ERW Steel Pipe: Engineered for diverse industrial applications including water wells casing and mechanical structures.
Product Name Beveled End 8Inch SCH 40 Water Wells Casing Welded Steel Pipe
Size Range 1-8 inch
Outside Diameter 21.3-630mm
Wall Thickness 1.8-22.2mm
Appearance Generally smooth, bright
Packing Export standard packing or according to customers' requirement
Certificate ISO9001:2008, SGS
Shipment Within 10-15 workdays (up to 30 days for orders over 1000 tons)
Steel Pipe Detail 1
Steel Pipe Detail 2
Processing View
Quality Control
Inventory
Application
Loading
Frequently Asked Questions
💡 Can you provide OEM/ODM service?
Yes. We offer comprehensive OEM and ODM services to meet specific project requirements. Please contact us to discuss the details.
💡 What are your payment terms?
Our standard terms are a 30% deposit via TT before production and the 70% balance against the copy of B/L. We also accept Irrevocable 100% L/C at sight.
💡 Can we visit the production facility?
Warmly welcome. Once we have your schedule, we will arrange a professional team to follow up on your visit and showcase our processes.
💡 Do you provide samples for testing?
Yes, samples for regular sizes are free of charge. However, the buyer is responsible for the freight/shipping costs.
💡 What types of surface coatings are available?
We offer anti-rusted painting, varnish painting, galvanizing, 3LPE, 3PP, Zinc oxide yellow primer, Zinc phosphate primer, and other custom requests.
💡 What is the expected delivery time?
For standard orders, shipment is typically within 10-15 workdays. Larger quantities exceeding 1000 tons may require 25-30 days.

Related Products