Factory Direct Sale Q235 Carbon Steel Pipe LSAW ERW Pipe Manufacturer

Still deciding? Get samples of $ !
Request Sample

Product Description

📋

Basic Information

Model NO.
Q235
End Connection
Beveled End
Length
Custom Length
Outer Diameter
4 inch
Surface Finish
Black
Type
LSAW Pipe
Wall Thickness
Schedule 40
Shape
Round
Thickness
Customized
Payment Term
EXW, CIF, CFR, FOB
Origin
China
🛠️

Product Description

Place of OriginChina
StandardGB
TechniqueERW
GradeQ195GB/ASTM Gr.D/Q215/Q235/S25JR/S275JR/S355JR ...
Delivery Time20~30 days
ApplicationFluid Pipe, Boiler Pipe, Drill Pipe, Hydraulic Pipe, Gas Pipe, OIL PIPE, Chemical Fertilizer Pipe, Structure Pipe
ThicknessCustomized
CertificateISO9001
Processing ServiceWelding, Punching, Cutting, Bending, Decoiling
TechnologyCold Rolled / Hot Rolled
Outer Diameter219 - 2020 mm
SurfaceBlack painted or others
🖼️

Detailed Photos

📜

Certifications

Certificate 1
Certificate 2
Certificate 3
🏢

Profile

Production Facility

Founded in 1988, we are a steel group which has integrated steel production, processing and trading into one. We specialize in manufacturing carbon seamless steel pipes, boiler tubes, heat exchanger tubes, and pipes for special uses. Our products are widely used in the field of oil, gas & fluid transmission, construction projects, chemistry, pharmacy, electricity, agriculture and metal work etc.

Frequently Asked Questions

Are you a trading company or a manufacturer?
We are a manufacturer. Our main products include stainless steel plates, carbon steel pipes, aluminum, and copper materials.
How do you control product quality?
Mill Test Certification is supplied with each shipment. Third-party inspections are available, and we are ISO and SGS verified to ensure high standards.
What are your standard terms of packing?
Generally, we pack our goods in bundles or coils with rods or belts. We can also pack goods according to specific customer requirements.
What is the typical delivery time?
For stock items, we can transport goods to the loading port within 7 days of receiving a deposit. The production period for custom orders usually takes 15 to 30 days.
What applications are these steel pipes suitable for?
Our pipes are ideal for fluid transmission, boiler systems, gas lines, oil transport, chemical processing, and structural engineering projects.
Do you offer processing services?
Yes, we provide various processing services including welding, punching, cutting, bending, and decoiling to meet customized specifications.

Related Products