BS1139 En39 En10219 Steel Tube Hollow Section Round Pipe Scaffolding Galvanized Steel Pipe

Still deciding? Get samples of $ !
Order Sample

Product Description

Basic Information
Model NO.
TJHY-TB5
Material
Steel
Type
Fixed
Structural Style
Multi-Pole Scaffolding
Framework
Combined Scaffolding
Surface Treatment
Hot DIP Galvanized/Pre-Galvanized/Painted
Steel Grade
Q195/Q235/Q355/Stk400/Stk500
Testing Report
SGS
Technique
ERW
Standard
BS1139/En39/En10219/Stk500
Package Size
200.00cm * 10.00cm * 10.00cm
Gross Weight
8.000kg
Product Description
Scaffolding Tube, Scaffolding Pipe, Steel Pipe, Steel Tube - these are fundamental steel materials adhering to various BS, EN, ASTM, and JIS standards. The pipe is typically used with scaffold couplers or as the core material to produce Ringlock, Frame, Cuplock, K-stage, and other scaffolding systems.
Feature Details
MaterialsQ195; Q235; Q355; S235, STK400, STK500, A53-A369; #10-#45 steel
Tolerance+/-3%
Surface TreatmentOiled/Black/Painted/Galvanized
Processing ServiceBending/Punching/Cutting
StandardEN39, BS1139, JIS1895, EN10219, EN12811
Delivery Time7-20 days
Production Capacity10,000 tons/Month
Technical Specifications
OD (Outer Diameter) Wall Thickness Length Customized
21mm(1/2'')0.6mm--2.2mm0m--6mYes
33.4mm(1'')0.6mm--2.2mm0m--6mYes
42mm1.4mm--4.0mm0m--6mYes
48.3mm(1-1/2'')1.8mm-4.0mm0m--6mYes
60.3mm(2'')1.8mm-4.0mm0m--6mYes
114.3mm(4'')2.0mm--10.0mm6m--12mYes
219.1mm(8'')2.5mm--10.0mm6m--12mYes
Quality Control & Inspection

We maintain strict inspection procedures for steel pipes. From raw materials and welding to size, surface treatment, and packaging, our QC team follows every step to ensure qualified products reach our customers.

Quality Control Process
Packaging & Loading

All tubes are packed in bundles (typically 61pcs/bundle) or with PP-cloth as requested. Lengths up to 5.9m can be loaded in 20ft containers, while 6m or longer are loaded in 40ft containers.

Packaging and Loading
Certificates & Standards

Order materials undergo SGS testing according to client requirements. As a professional scaffolding supplier, we guarantee all products with honest support and consistent quality.

Certificate 1 Certificate 2 Certificate 3
Manufacturing Overview

The manufacturing facility is located in a major production base for steel and scaffolding products, benefiting from proximity to large port facilities for global transportation.

We specialize in Ringlock systems, steel boards, frame systems, jack bases, pipes, couplers, and cuplock systems. With over 10 years of experience, products are exported to Southeast Asia, the Middle East, Europe, America, and Australia.

Factory View 1 Factory View 2 Factory View 3
Related Products
Related Scaffolding Products
Frequently Asked Questions
Where is the loading port?
Major local international port.
What's the MOQ of the product?
Different items have different MOQs, which can be negotiated.
What certificates do you have?
We have ISO 9001, SGS, and other relevant industry certifications.
Can I get some samples?
Yes, samples are free, but shipping costs are covered by the customer.
How long is the production cycle?
Generally, the production cycle takes around 20-30 days.
What are the payment methods?
T/T or 100% irrevocable LC at sight; terms are negotiable.

Related Products