BS1139 En39 48.3mm Galvanized Scaffolding Tube Gi Steel Pipe

Still deciding? Get samples of $ !
Request Sample

Product Description

Basic Information
Model NO.pp0029
TechniqueERW
MaterialCarbon Steel
Surface TreatmentGalvanized
UsageConstruction & Decoration, Scaffolding
Section ShapeRound
ColorSilver
OriginChina
Product Display
Scaffolding Tube Banner
Galvanized Scaffolding Tube 1
Galvanized Scaffolding Tube 2
Technical Specification
Product Item Details
Product Name Scaffolding Pipe
Material Q235B, Q355B Carbon Steel
Outer Diameter 48.3mm
Wall Thickness 2.5mm – 4.5mm (common: 3.0mm, 3.5mm)
Length 1.5m, 2.0m, 2.5m, 3.0m, 6.0m (Standard), Customizable
Surface Treatment Hot-Dip Galvanized (80–120g/m²), Anti-Rust Painted, Black
Technology Cold Drawn (CD), Hot Rolled (HR)
Connection Compatible with scaffolding couplers, cup locks, quick-lock connectors
Product Description
Scaffolding Tube Application
High-Performance Scaffolding Solution
Scaffolding Pipe is the core load-bearing component of scaffolding structures, widely used in construction, maintenance, renovation and other high-altitude operation projects. It is specially designed to connect and support the entire scaffolding system, providing a stable and safe foundation for workers' high-altitude operations. Made of high-quality carbon steel with professional processing and surface treatment, scaffolding pipe combines strength, durability and easy assembly.
Scaffolding Detail 1
Scaffolding Detail 2
Scaffolding Detail 3
Main Products & Production
Main Products Range
Production Facility
Our facilities cover an area of 35,000 square meters with a dedicated workforce. We specialize in producing welded pipes, hot-dip galvanized pipes, and comprehensive scaffolding systems including couplers, planks, steel props, ladder beams, and ring lock systems. With an annual output of over 50,000 tons, our production lines include complete blanking, cutting, welding, and galvanizing processes.
Factory Overview
Exhibition & Global Presence
Exhibition Photo
Packaging & Quality Certificate
Packaging
Certificate
Frequently Asked Questions
Are you a factory or a trading company?
We have our own steel production base for one-stop procurement, offering competitive pricing, excellent quality, and fast delivery. We operate our own factories and hold interests in related enterprises.
Can you provide samples?
Yes, samples can be provided if they are currently available in our stock.
Can you arrange the shipment?
Certainly. We work with permanent freight forwarders who secure the best rates from major shipping lines and provide professional logistics services.
What is the expected delivery time?
Delivery typically takes 25-45 days after receiving the deposit or L/C, depending on the specific order requirements.
How do you ensure quality control?
We maintain strict quality protocols, including a pre-production sample before mass manufacturing and a final comprehensive inspection before every shipment.
What are your standard payment terms?
We accept 100% irrevocable L/C at sight, or T/T with a 30% advance payment and the balance settled against the copy of the B/L within 3-5 days.

Related Products